Posted on 03/02/2021 03/02/2021 By/Par The Gaspé Spec - Gilles Gagné New loading track in New Richmond is up and running #2021, #Fabrication Delta, #Gaspésie Railway Society : maintenance and operation of the rail, #Gilles Gagné, #LM Wind Power, #Ponts ferroviaires : Cascapédia-Saint-Jules - (nouveau pont déc. 2020), #The Gaspé Spec, #The Gaspé Spec - Gilles Gagné,
Posted on 13/01/2021 13/01/2021 By/Par The Gaspé Spec - Gilles Gagné Windmill blades temporarily loaded in Nouvelle #2021, #Bridges (railway) : Cascapedia-Saint-Jules, #Fabrication Delta, #Gaspésie Railway Society, #Gilles Gagné, #LM Wind Power, #Luc Levesque (directeur général - Société du chemin de fer de la Gaspésie), #The Gaspé Spec, #The Gaspé Spec - Gilles Gagné,